1. Contact us through our different service channels.

5. Project down-payment.

2. Send us your most recent electricity bill on both sides.

6. Scheduling the installation date.

3. We visit your property to verify the space available to install.

7. We install the photovoltaic system.

4. We prepare the formal quote and a 3D model of the project.

8. Final payment of the project.

9. Interconnection procedure before CFE.

10. Installation of the Bidirectional meter.

11. We turn on the photovoltaic system and connect to the Wi-Fi for monitoring.

12. Start generating your own electrical energy.

INTERCONNECTION DIAGRAM TO THE CFE NETWORK
Photovoltaic System
Inverter
Bidirectional meter
electrical network
Consumption